Compliance command center
Every NYC filing for this building, watched continuously by Atlas. One needs you.
Atlas Watching 14 rules
Compliance monitor · sources every claim to the agency of record
last full sweep · 6:00 AM
The portfolio is compliant with no open violations. The only thing on your plate is the
DHCR annual rent registration (due April 1): I've drafted it, but
3 stabilized units are missing 2025 rent data I can't infer. Everything else below is filed,
on track, or prepared and waiting for its window.
Compliance autonomy is set to Draft & confirm (L2) — Atlas prepares filings, you approve before anything is submitted. Change autonomy
Open violations
0
▲ clear across HPD · DOB · ECB
Needs your attention
1 of 14 rules
DHCR registration · missing data
Filings due · next 90 days
3
all drafted by Atlas
Penalty exposure avoided · YTD
$23.4k
▲ deadlines met that carry fines
AgencyRequirementHandled byStatusDeadline
DHCR
Annual rent registration
3 stabilized units missing 2025 rent — needs your review
Atlas drafted
Needs you
Apr 1in 33 days
DHCR
Lease renewal — Apt 4C (stabilized)
RGB 1-yr cap 3.0% applied · notice window opens in 12 days
Atlas prepared
Window soon
Apr 13window opens
DOB
Local Law 97 — 2024 emissions report
Projected 8% under cap · no penalty exposure
Atlas prepared
Upcoming
May 1in 63 days
DOB
LL152 — gas piping inspection
Community District cycle · vendor not yet scheduled
Atlas tracking
Upcoming
Jun 30in 123 days
DOB
Façade inspection — LL11 / FISP cycle 9
SWARMP status filed · vendor report attached
Atlas filed
Filed
Jun 9confirmed
HPD
Annual property registration
Confirmation #HPD-2025-44871 · no open violations
Atlas filed
Filed
Sep 1confirmed
HPD
LL31 — lead paint XRF inspection
Units with children under 6 inspected · records on file
Atlas filed
Filed
Dec 31on file
HPD
Bedbug annual filing (HPD-form)
Zero infestations reported building-wide
Atlas filed
Filed
Dec 31confirmed
DOF
LL84 — energy & water benchmarking
Portfolio Manager submission accepted
Atlas filed
Filed
May 1prior year
DOB
Boiler inspection — annual
Low-pressure boiler · report filed with DOB
Atlas filed
Filed
Jan 15confirmed
Rent stabilization
· the core of the wedge41 of 56 units stabilized
Registered with DHCR (2024)41 / 41
2025 registration drafted38 / 41
Preferential rent units tracked9
Renewals in next 120 days6
RGB rates loaded (2025–26)1-yr 3.0% · 2-yr 5.0%
IAI cap headroom flagged2 units
Recent compliance activity
Full log →Flagged Apt 6B preferential-rent renewal — HSTPA rules need a human read.today · 6:03 AM · escalated
Drafted DHCR registration for 38 of 41 units; 3 awaiting rent data.today · 6:01 AM
Loaded 2025–26 RGB rates and re-checked every stabilized renewal in range.Jun 24
Filed FISP cycle 9 SWARMP status with DOB; attached vendor report.Jun 9
Confirmed HPD registration accepted — no open violations.Jun 2
Prototype, not product. Filings, deadlines, and unit counts are realistic fake data for
the founder's 56-unit mixed-use building. This screen exists to test the wedge: does a single
register that watches every NYC rule and acts before the deadline feel like the reason to
switch? Nothing is wired up — no filing is actually submitted.