Awaiting your approval. Draft is complete for 38 units; 3 flagged for rent data. Atlastoday · 6:03 AM
Flagged 3 gaps — 2A, 4C, 6B missing a sourceable 2025 rent; escalated rather than guessing. Atlastoday · 6:01 AM
Drafted registration for 38 units; ran RGB caps and preferential-rent rider checks. Atlastoday · 6:00 AM
Pulled prior registration — imported the 2024 DHCR roster of 41 stabilized units as the baseline. AtlasJun 27 · 11:40 PM
Opened the registration window 60 days before the April 1 deadline. AtlasJun 27 · scheduled
Why this matters. Missing the April 1 DHCR registration can freeze your ability to
collect lawful rent increases on every stabilized unit until you re-register — and exposes you to
overcharge claims. The three flagged units are the only thing standing between this draft and a clean,
on-time filing.
Prototype, not product. This is a realistic fake DHCR filing for the founder's 41 stabilized
units at 1240 Grand Concourse. It shows the wedge: Atlas prepares the NYC filing, sources every claim,
and waits for you to approve before anything is submitted. Nothing here is wired up — no registration
is actually submitted to DHCR.